|
Some
of the projects where Carsten Kuhnert MSc MBA CEng MICE Eur Ing has
provided consultancy services for other engineering consultancies:
Road and Service
Bridge – Al Kiran, Kuwait for Buro Happold, London, UK
- Structural design for one 6-lane 125 m long
pre-stressed concrete beam road bridge and
one 125 m long pre-stressed concrete beam service
bridge
- Construction costs: 4.6 m €
Road Bridge
– Ras Laffan, Qatar for High Point Rendel, London, UK
- Structural
design for six 4-lane up to 178 m long pre-stressed concrete beam road
bridges
- Construction costs 11.5 m €
Lift and Movement of footbridge,
Gatwick Airbridge for Dorman Long Technology, Higham Ferrers, UK
- Structural design for lifting structure to lift
and move 175 m long (2185 tonnes) bridge
across Gatwick Airport
- Lifting operation and construction costs: 1.8 m
€
|